Support road.cc

Like this site? Help us to make it better.

news

LCC launches mass email campaign over TfL's Blackfriars Bridge traffic plan

Campaigners hope to make TfL think again by flooding its inbox with objections

London's cyclists and anyone that uses Blackfriars Bridge are being urged to email Transport for London (TfL) to object to the proposals for traffic management on the bridge and the area surrounding Blackfriars station including the removal of the southbound cycle lane over the bridge and the narrowing of the northbound cycle lane.

TfL's current consultation process for the scheme closes on 15 April and before then the London Cycling Campaign hopes to flood TfL's inbox with thousands of objections to the plans - the email address to send objections to the proposals too is STEngagement [at] tfl.gov.uk. Whatever traffic management measures are finally agreed are likely to be in place for a generation so as the LCC points out on its website "if you fail to email now, we could be stuck with the dangers for the foreseeable future." LCC have posted a letter covering the reasons why cyclists are objecting to the scheme as it stands, but they also suggest that your own words will have an even more powerful effect.

TfL are making the changes at Blackfriars to cope with a massive increase in the numbers of pedestrians expected to be using Blackfriars station when it reopens later this year following refurbishment – predicted to rise from 4000 to 10,000 during the morning peak. TfL believes that the current street layout will be unable to cope with these numbers which is why they are proposing to widen pavements and install two major new pedestrian crossings. However, TfL is also keen to minimise the impact to traffic flows to this end they want to add more traffic lanes to enable them to 'stack' traffic and avoid congestion the current southbound cycle lane outside the station that helps cyclists get on to the bridge would disappear as part of this plan.

This critics, including the LCC, point out prioritises the desire to keep motorised traffic moving ahead of the safety of cyclists even though cyclists already make up one third of traffic using the bridge during peak times.

As road.cc reported last month TfL have already been forced to move on their original proposals, reopening the consultation process and bringing forward the suggestion of an "additional cycle facility" so that cyclists can more easily turn right onto Blackfriars Bridge. This has so far failed to appease critics of the scheme who point out the particular importance of London's bridges to the movement of commuter cycle traffic in the capital and claim that it will hamper the continued growth of cycling in the capital something London's mayor has been keen to champion. Cycling across Blackfriars Bridge is a particularly emotive subject for many in London's cycling community because the current arrangements for cycle traffic were put in place following the deaths of two cyclists on the bridge within 15 months.

road.cc's founder and first editor, nowadays to be found riding a spreadsheet. Tony's journey in cycling media started in 1997 as production editor and then deputy editor of Total Bike, acting editor of Total Mountain Bike and then seven years as editor of Cycling Plus. He launched his first cycling website - the Cycling Plus Forum at the turn of the century. In 2006 he left C+ to head up the launch team for Bike Radar which he edited until 2008, when he co-launched the multi-award winning road.cc - finally handing on the reins in 2021 to Jack Sexty. His favourite ride is his ‘commute’ - which he does most days inc weekends and he’s been cycle-commuting since 1994. His favourite bikes are titanium and have disc brakes, though he'd like to own a carbon bike one day.

Add new comment

3 comments

Avatar
Tony Farrelly | 13 years ago
0 likes

Sorry about that, dunno what happened to the link to the TfL email address but I've put it in again and it seems to work now.

Avatar
maxbro | 13 years ago
0 likes

What is the email address for TFL?

Avatar
Paul M | 13 years ago
0 likes

If you do write in, you might care to challenge the TfL assertion that not providing the extra southbound lane will cause "unacceptable delays". For the last two years there have been only two southbound lanes. Delays have been almost unknown in all that time, so why would they occur now if the extra lane is not provided?

Furthermore, the proposal envisages that the neasrside lane southbound will be a mere 2.6m wide - just 10cm wider than the design standard width for a cycle lane! How precisely will motor traffic be able to overtake any cyclists riding in this lane? Apart that is from knocking them down or intimidating them off the road. Otherwise the bicycle will take on a new status as a rolling speed hump.

Finally, if you do write in, be sure to copy your own MP or member of the London Assembly, and make sure they know this is a question of their constituent's welfare and safety.

Latest Comments